Mississippi, AR interconnection queue
20 active projects totaling 4,800 MW in the MISO queue, plus 11 with terminal status (shown grayed).
20active projects
4,800active MW
31total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J1897 | Not reported | 500 | 500 | Hybrid | Active |
| J1899 | Not reported | 500 | 500 | Hybrid | Active |
| J2190 | Not reported | 500 | 500 | Hybrid | Active |
| J2696 | Not reported | n/r | 500 | Solar | Active |
| J3401 | Not reported | 500 | 500 | Solar | Active |
| J3427 | Not reported | 500 | 500 | Solar | Withdrawn |
| J1858 | Not reported | n/r | 440 | Solar | Active |
| J1078 | Not reported | 500 | 300 | Solar | Withdrawn |
| J3575 | Not reported | 161 | 300 | Solar | Withdrawn |
| J2294 | Not reported | 161 | 250 | Solar | Active |
| J3580 | Not reported | 161 | 250 | Battery | Withdrawn |
| J3271 | Not reported | 161 | 230 | Solar | Withdrawn |
| J1562 | Not reported | 161 | 200 | Solar | Active |
| J2089 | Not reported | 161 | 200 | Solar | Active |
| J2181 | Not reported | 161 | 200 | Solar | Active |
| S1100 | Surplus; J1562 | 161 | 200 | Battery | Active |
| J586 | Not reported | 161 | 175 | Solar | Active |
| J1155 | Not reported | 230 | 150 | Solar | Active |
| J3619 | Not reported | 161 | 150 | Solar | Active |
| J3620 | Not reported | 161 | 150 | Battery | Withdrawn |
| J3706 | Not reported | 161 | 150 | Wind | Withdrawn |
| J3376 | Not reported | n/r | 130 | Solar | Withdrawn |
| J1514 | Not reported | 203 | 100 | Solar | Active |
| J2522 | Not reported | 161 | 100 | Battery | Withdrawn |
| J4029 | Not reported | 230 | 85 | Hybrid | Active |
| J1023 | Not reported | 161 | 82 | Solar | Withdrawn |
| J2871 | Not reported | 161 | 70 | Hybrid | Active |
| J1670 | Not reported | 161 | 50 | Solar | Active |
| J2051 | Not reported | 161 | 50 | Battery | Withdrawn |
| J2081 | Not reported | 500 | 20 | Coal | Active |
| J1146 | Not reported | 500 | 10 | Coal | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.