MISO request J2696

MISO queue ID J2696

Queue request J2696 was listed in the MISO interconnection queue at the end of 2025 as a 500 MW solar project in Mississippi County, AR, according to Berkeley Lab’s queue data file. The filing names Sandy Bayou as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 15, 2027.

Queue IDJ2696
Project nameNot reported
Status (as published)Active
SubstationSandy Bayou
Point of interconnectionSandy Bayou
CountyMississippi
StateAR
VoltageNot reported
Capacity500 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-04-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Sandy Bayou substation: 2 requests in the MISO queue, 2 active totaling 940 MW.

Queue IDProjectMWResourceStatus
J1858Not reported440SolarActive

Mississippi, AR: 31 requests in the MISO queue, 20 active totaling 4,800 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY ARKANSAS
ClusterDPP-2022 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.