MISO request J2190
MISO queue ID J2190
Queue request J2190 was listed in the MISO interconnection queue at the end of 2025 as a 500 MW hybrid project in Mississippi County, AR, according to Berkeley Lab’s queue data file. The filing names DELL EHV - SAN SOUCI as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 22, 2027.
| Queue ID | J2190 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | DELL EHV - SAN SOUCI |
| Point of interconnection | DELL EHV - SAN SOUCI 500.0kV |
| County | Mississippi |
| State | AR |
| Voltage | 500 kV |
| Capacity | 500 MW |
| Resource (as published) | Solar+Battery |
| Resource category | Hybrid (normalized for filtering) |
| Proposed online date | 2027-10-22 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
DELL EHV - SAN SOUCI substation: 4 requests in the MISO queue, 4 active totaling 2,000 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J1897 | Not reported | 500 | Hybrid | Active |
| J1899 | Not reported | 500 | Hybrid | Active |
| J3401 | Not reported | 500 | Solar | Active |
Mississippi, AR: 31 requests in the MISO queue, 20 active totaling 4,800 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | ENTERGY ARKANSAS |
|---|---|
| Cluster | DPP-2021 South |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Pending |
| Study phase (as the queue printed it) | Study Phase: GIA In Process; Post GIA Status: Not Started |
| Queue date | 2021-08-24 |
| Interconnection agreement date | 2025-12-10 |
| Components (hybrid) | Solar 500 MW + Battery |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.