Substation Scout

MISO request J2081

MISO queue ID J2081

Queue request J2081 was listed in the MISO interconnection queue at the end of 2025 as a 20 MW coal project in Mississippi County, AR, according to Berkeley Lab’s queue data file. The filing names Sans Souci as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 1, 2027.

Queue IDJ2081
Project nameNot reported
Status (as published)Active
SubstationSans Souci
Point of interconnectionSans Souci 500kV
CountyMississippi
StateAR
Voltage500 kV
Capacity20 MW
Resource (as published)Coal
Resource categoryCoal (normalized for filtering)
Proposed online date2027-10-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Mississippi, AR: 31 requests in the MISO queue, 20 active totaling 4,800 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY ARKANSAS
ClusterDPP-2021 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Pending
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2021-08-25
Withdrawn date2025-12-09

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first