Substation Scout

Linn, IA interconnection queue

16 active projects totaling 3,679.9 MW in the MISO queue, plus 10 with terminal status (shown grayed).

16active projects
3,679.9active MW
26total filed
Queue IDProjectkVMWResourceStatus
E0025 Not reported 345 986.9 Gas Withdrawn
E0050 Not reported 345 986.9 Gas Active
E0009 Linn County Generating Facility 161 675.5 Nuclear Withdrawn
J3932 Not reported 161 646 Nuclear Active
R1012 Replace 15 MW of ALTW.FPL_DAEC Unit with Battery; Duane Arnold 161 640 Hybrid Withdrawn
G157 Not reported n/r 500 Other Withdrawn
G158 Not reported n/r 500 Other Withdrawn
J2268 Not reported n/r 400 Solar Active
J2469 Not reported 345 300 Battery Active
R5071 Replacing 244 MW of Solar with Nuclear; Duane Arnold n/r 251 Nuclear Active
J1284 Not reported 345 250 Solar Withdrawn
J1444 Not reported 345 200 Solar Active
R5069 Replacing 200 MW of Solar with Nuclear; J1444 n/r 200 Nuclear Active
J4155 Not reported 115 195 Battery Active
J2120 Not reported n/r 100 Battery Active
J999 Not reported 161 100 Solar Withdrawn
R5072 Replacing 100 MW of Solar with Nuclear; Duane Arnold n/r 100 Nuclear Active
J1359 Not reported 69 95 Gas Active
R1042 Replacing 50 MW of solar generation with BESS; Duane Arnold 161 64 Hybrid Withdrawn
R5070 Replacing 50 MW of Solar with Nuclear; Duane Arnold n/r 64 Nuclear Active
J1889 Not reported n/r 60 Solar Active
R1007 Replace 60 MW of ALTW.FPL_DAEC Unit with Battery; Duane Arnold 161 60 Hybrid Withdrawn
J1285 Not reported 345 50 Battery Withdrawn
J504 Not reported 161 50 Solar Active
G726 Not reported n/r 30 Nuclear Operational
G230 Not reported n/r 2 Other Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first