Queue request J504 was listed in the MISO interconnection queue at the end of 2025 as a 50 MW solar project in Linn County, IA, according to Berkeley Lab’s queue data file. The filing names Bertram-Duane Arnold line as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of October 15, 2020.
| Queue ID | J504 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Bertram-Duane Arnold line |
| Point of interconnection | 161 kV Bertram-Duane Arnold line |
| County | Linn |
| State | IA |
| Voltage | 161 kV |
| Capacity | 50 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2020-10-15 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Linn, IA: 26 requests in the MISO queue, 16 active totaling 3,679.9 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Cluster | DPP-2016-FEB West |
|---|---|
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Executed |
| Study phase (as the queue printed it) | GIA |
| Queue date | 2015-11-13 |
| Interconnection agreement date | 2019-02-07 |
| Operational date | 2024-03-31 |