7 active projects totaling 1,426.7 MW in the MISO queue, plus 2 with terminal status (shown grayed).

7active projects
1,426.7active MW
9total filed
Queue IDProjectkVMWResourceStatus
G758 Not reported 138 550 Coal Withdrawn
E0033 Mitchell BESS n/r 526.7 Battery Active
J1058 Not reported 345 300 Solar Active
J2215 Not reported 345 300 Battery Active
J1353 Not reported 138 150 Battery Withdrawn
J1386 Not reported 138 100 Solar Active
R5067 Replacing 100 MW of Solar with storage; J1386 138 100 Battery Active
S1027 Surplus; J1386 n/r 50 Hybrid Active
S1044 Surplus; J1386 138 50 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.