Replacing 100 MW of Solar with storage; J1386
MISO queue ID R5067
Replacing 100 MW of Solar with storage; J1386 (R5067) was listed in the MISO interconnection queue at the end of 2025 as a 100 MW battery project in Lake County, IN, according to Berkeley Lab’s queue data file. The filing names NIPSCO Green Acres Sub as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2028.
| Queue ID | R5067 |
|---|---|
| Project name | Replacing 100 MW of Solar with storage; J1386 |
| Status (as published) | Active |
| Substation | NIPSCO Green Acres Sub |
| Point of interconnection | NIPSCO Green Acres 138kV Sub |
| County | Lake |
| State | IN |
| Voltage | 138 kV |
| Capacity | 100 MW |
| Resource (as published) | Battery |
| Resource category | Battery (normalized for filtering) |
| Proposed online date | 2028-12-01 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Lake, IN: 9 requests in the MISO queue, 7 active totaling 1,426.7 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | NORTHERN INDIANA PUBLIC SERVICE COMPANY |
|---|---|
| Project type | Generation |
| Queue date | 2025-07-03 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.