Substation Scout

Lafayette, WI interconnection queue

4 active projects totaling 594 MW in the MISO queue, plus 7 with terminal status (shown grayed).

4active projects
594active MW
11total filed
Queue IDProjectkVMWResourceStatus
J1773 Not reported 345 300 Wind Active
J819 Not reported 138 99.9 Wind Withdrawn
G282 Not reported 138 99 Wind Withdrawn
G995 Not reported 138 99 Wind Withdrawn
J109 Not reported 138 99 Wind Withdrawn
J1512 Not reported 138 98.9 Wind Withdrawn
J395 Not reported 138 98 Wind Operational
J652 Not reported 138 98 Wind Operational
S1092 Surplus; ALTE.QUILTBLCK n/r 98 Battery Active
G749 Not reported 69 50 Wind Withdrawn
J807 Not reported 138 41.4 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.