Surplus; ALTE.QUILTBLCK (S1092) was listed in the MISO interconnection queue at the end of 2025 as a 98 MW battery project in Lafayette County, WI, according to Berkeley Lab’s queue data file. The filing names Falcon as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2027.

Queue IDS1092
Project nameSurplus; ALTE.QUILTBLCK
Status (as published)Active
SubstationFalcon
Point of interconnectionFalcon
CountyLafayette
StateWI
VoltageNot reported
Capacity98 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2027-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lafayette, WI: 11 requests in the MISO queue, 4 active totaling 594 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityAMERICAN TRANSMISSION COMPANY
Project typeGeneration
Queue date2025-03-04

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first