Queue request J652 was listed in the MISO interconnection queue at the end of 2025 as a 98 MW wind project in Lafayette County, WI, according to Berkeley Lab’s queue data file. The filing names Darlington - Hillman as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 15, 2017.

Queue IDJ652
Project nameNot reported
Status (as published)Operational
SubstationDarlington - Hillman
Point of interconnectionDarlington - Hillman 138kV
CountyLafayette
StateWI
Voltage138 kV
Capacity98 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2017-09-15
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Lafayette, WI: 11 requests in the MISO queue, 4 active totaling 594 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2016-AUG East (ATC)
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)GIA
Queue date2016-07-05
Interconnection agreement date2018-09-13
Operational date2017-09-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.