10 active projects totaling 3,428.9 MW in the MISO queue, plus 6 with terminal status (shown grayed).

10active projects
3,428.9active MW
16total filed
Queue IDProjectkVMWResourceStatus
E0012 Red Oak Ridge Energy Center 345 1,211.3 Gas Active
J4165 Not reported n/r 1,203 Gas Active
G167 Not reported n/r 1,200 Other Withdrawn
J3330 Not reported 345 705 Gas Withdrawn
J4020 Not reported 345 481 Gas Withdrawn
J1009 Not reported 345 400 Solar Withdrawn
J1010 Not reported 345 400 Solar Withdrawn
J1011 Not reported 345 400 Solar Withdrawn
J1895 Not reported n/r 200 Battery Active
J878 Not reported 138 200 Solar Active
J1934 Not reported 138 150 Battery Active
J3936 Not reported 345 132.3 Gas Active
S1090 Surplus; J1316 n/r 132.3 Hybrid Active
J1778 Not reported 138 100 Solar Active
J1316 Not reported 138 50 Battery Active
J2891 Not reported n/r 50 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first