Red Oak Ridge Energy Center (E0012) was listed in the MISO interconnection queue at the end of 2025 as a 1,211.3 MW gas project in Kenosha County, WI, according to Berkeley Lab’s queue data file. The filing names Paris-Lakeview double circuit as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of December 1, 2027.

Queue IDE0012
Project nameRed Oak Ridge Energy Center
Status (as published)Active
SubstationParis-Lakeview double circuit
Point of interconnectionParis-Lakeview 345kV double circuit
CountyKenosha
StateWI
Voltage345 kV
Capacity1,211.3 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-12-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Kenosha, WI: 16 requests in the MISO queue, 10 active totaling 3,428.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityWisconsin Electric
DeveloperInvenergy
ClusterERAS Study Cycle 1
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: Done
Queue date2025-08-06
Interconnection agreement date2025-12-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first