Substation Scout

MISO request J3936

MISO queue ID J3936

Queue request J3936 was listed in the MISO interconnection queue at the end of 2025 as a 132.3 MW gas project in Kenosha County, WI, according to Berkeley Lab’s queue data file. The filing names PARIS Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of January 1, 2027.

Queue IDJ3936
Project nameNot reported
Status (as published)Active
SubstationPARIS Substation
Point of interconnectionPARIS 345kV Substation
CountyKenosha
StateWI
Voltage345 kV
Capacity132.3 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2027-01-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Kenosha, WI: 16 requests in the MISO queue, 10 active totaling 3,428.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP Cycle Pending East (ATC)
Interconnection serviceNRIS
Project typeGeneration
Queue date2025-02-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first