Substation Scout

Surplus; J1316

MISO queue ID S1090

Surplus; J1316 (S1090) was listed in the MISO interconnection queue at the end of 2025 as a 132.3 MW hybrid project in Kenosha County, WI, according to Berkeley Lab’s queue data file. The filing names EAST PARIS as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 24, 2026.

Queue IDS1090
Project nameSurplus; J1316
Status (as published)Active
SubstationEAST PARIS
Point of interconnectionEAST PARIS
CountyKenosha
StateWI
VoltageNot reported
Capacity132.3 MW
Resource (as published)Gas+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2026-09-24
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Kenosha, WI: 16 requests in the MISO queue, 10 active totaling 3,428.9 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
Project typeGeneration
Queue date2025-01-31
Components (hybrid)Gas 132.3 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first