Substation Scout

Jackson, AR interconnection queue

10 active projects totaling 3,580 MW in the MISO queue, plus 12 with terminal status (shown grayed).

10active projects
3,580active MW
22total filed
Queue IDProjectkVMWResourceStatus
J2261 Not reported 500 625 Solar Active
J2262 Not reported 500 625 Solar Active
J1855 Not reported n/r 500 Solar Active
J2682 Not reported 161 500 Solar Withdrawn
J2936 Not reported 500 500 Solar Withdrawn
J3192 Not reported 161 500 Solar Active
J2252 Not reported n/r 300 Solar Active
J2613 Not reported 500 300 Wind Active
J2796 Not reported 161 250 Solar Withdrawn
J3173 Not reported 161 220 Solar Withdrawn
J2641 Not reported n/r 200 Wind Active
J3073 Not reported 500 200 Battery Withdrawn
J3120 Not reported 161 200 Hybrid Active
J3423 Not reported 161 200 Solar Withdrawn
J919 Not reported 161 180 Solar Active
J1856 Not reported n/r 150 Solar Active
J655 Not reported n/r 101.5 Solar Withdrawn
J1137 Not reported 161 100 Solar Withdrawn
J2223 Not reported 161 100 Battery Withdrawn
J3191 Not reported 161 100 Solar Withdrawn
J681 Not reported n/r 100 Solar Withdrawn
J370 Not reported 161 50 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.