MISO request J919
MISO queue ID J919
Queue request J919 was listed in the MISO interconnection queue at the end of 2025 as a 180 MW solar project in Jackson County, AR, according to Berkeley Lab’s queue data file. The filing names Cash - Newport AB Line Tap as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of February 2, 2022.
| Queue ID | J919 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Cash - Newport AB Line Tap |
| Point of interconnection | Cash - Newport AB 161 kV Line Tap |
| County | Jackson |
| State | AR |
| Voltage | 161 kV |
| Capacity | 180 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Proposed online date | 2022-02-02 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Cash - Newport AB Line Tap substation: 2 requests in the MISO queue, 1 active totaling 180 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| J942 | Not reported | 107 | Solar | Withdrawn |
Jackson, AR: 22 requests in the MISO queue, 10 active totaling 3,580 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | Entergy |
|---|---|
| Cluster | DPP-2017-AUG South |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | Construction |
| Study phase (as the queue printed it) | Study Phase: GIA; Post GIA Status: Under Construction |
| Queue date | 2017-06-16 |
| Interconnection agreement date | 2019-11-21 |
| Operational date | 2023-10-06 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.