Dakota, MN interconnection queue

9 active projects totaling 1,286 MW in the MISO queue, plus 15 with terminal status (shown grayed).

9active projects
1,286active MW
24total filed
Queue IDProjectkVMWResourceStatus
G259 Not reported n/r 1,100 Gas Withdrawn
G223 Not reported n/r 750 Gas Withdrawn
G168 Not reported n/r 700 Gas Withdrawn
G271 Not reported n/r 670 Gas Withdrawn
J167 Not reported 115 500 Gas Withdrawn
J284 Not reported 345 316 Gas Withdrawn
J2716 Not reported 345 300 Battery Active
J399 Not reported 115 232 Gas Operational
J863 Not reported 115 220 Gas Withdrawn
G351 Not reported 345 200 Gas Withdrawn
G352 Not reported 345 200 Gas Withdrawn
J1105 Not reported 345 200 Solar Withdrawn
J4065 Not reported 115 200 Battery Active
J2652 Not reported 115 197 Battery Withdrawn
J2027 Not reported 345 150 Solar Active
J2872 Not reported 345 150 Battery Withdrawn
J3543 Not reported 115 150 Battery Active
G020 Not reported n/r 147 Coal Operational
J1468 Not reported 115 100 Battery Withdrawn
J3172 Not reported 115 100 Battery Active
J403 Not reported n/r 49.9 Gas Withdrawn
J304 Not reported 69 20 Solar Withdrawn
J1826 Not reported 69 4 Hydro Active
J3219 Not reported n/r 3 Hydro Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.