Substation Scout

MISO request J399

MISO queue ID J399

Queue request J399 was listed in the MISO interconnection queue at the end of 2025 as a 232 MW gas project in Dakota County, MN, according to Berkeley Lab’s queue data file. The filing names Black Dog substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of February 1, 2018.

Queue IDJ399
Project nameNot reported
Status (as published)Operational
SubstationBlack Dog substation
Point of interconnectionBlack Dog 115 kV substation
CountyDakota
StateMN
Voltage115 kV
Capacity232 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2018-02-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Dakota, MN: 24 requests in the MISO queue, 9 active totaling 1,286 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2015-AUG West
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)DPP - SIS
Queue date2014-10-15
Interconnection agreement date2017-09-01
Operational date2018-02-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first