Substation Scout

MISO request J3219

MISO queue ID J3219

Queue request J3219 was listed in the MISO interconnection queue at the end of 2025 as a 3 MW hydro project in Dakota County, MN, according to Berkeley Lab’s queue data file. The filing names CANNON FALLS TRANSM. as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2023.

Queue IDJ3219
Project nameNot reported
Status (as published)Active
SubstationCANNON FALLS TRANSM.
Point of interconnectionCANNON FALLS TRANSM.
CountyDakota
StateMN
VoltageNot reported
Capacity3 MW
Resource (as published)Hydro
Resource categoryHydro (normalized for filtering)
Proposed online date2023-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Dakota, MN: 24 requests in the MISO queue, 9 active totaling 1,286 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityNORTHERN STATES POWER COMPANY
ClusterDPP-2022 West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-14

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first