MISO request J1826
MISO queue ID J1826
Queue request J1826 was listed in the MISO interconnection queue at the end of 2025 as a 4 MW hydro project in Dakota County, MN, according to Berkeley Lab’s queue data file. The filing names Cannon Falls Transmission as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 30, 2024.
| Queue ID | J1826 |
|---|---|
| Project name | Not reported |
| Status (as published) | Active |
| Substation | Cannon Falls Transmission |
| Point of interconnection | Cannon Falls Transmission 69 kV |
| County | Dakota |
| State | MN |
| Voltage | 69 kV |
| Capacity | 4 MW |
| Resource (as published) | Hydro |
| Resource category | Hydro (normalized for filtering) |
| Proposed online date | 2024-08-30 |
| Source dataset | Berkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025 |
Same substation and county
Dakota, MN: 24 requests in the MISO queue, 9 active totaling 1,286 MW.
Tracked changes
Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.
Additional filed fields
| Utility | NORTHERN STATES POWER COMPANY |
|---|---|
| Cluster | DPP-2020 West |
| Interconnection service | NRIS |
| Project type | Generation |
| Study phase (standardized by Berkeley Lab) | IA Pending |
| Study phase (as the queue printed it) | Study Phase: GIA In Process; Post GIA Status: Not Started |
| Queue date | 2022-09-08 |
| Interconnection agreement date | 2024-04-07 |
Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.
Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.