Substation Scout

Clinton, IA interconnection queue

7 active projects totaling 1,260 MW in the MISO queue, plus 5 with terminal status (shown grayed).

7active projects
1,260active MW
12total filed
Queue IDProjectkVMWResourceStatus
G178 Not reported n/r 600 Other Withdrawn
G179 Not reported n/r 600 Gas Withdrawn
G125 Not reported n/r 325 Other Withdrawn
J009 Not reported 345 250 Wind Withdrawn
J1432 Not reported 345 250 Wind Active
J2272 Not reported n/r 250 Hybrid Active
J1190 Not reported 161 200 Solar Active
S1107 Surplus; J1190 n/r 200 Battery Active
J3153 Not reported 161 160 Gas Active
J1084 Not reported 345 150 Solar Active
J1549 Not reported 161 125 Solar Withdrawn
G577 Not reported 69 50 Coal Operational

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first