Surplus; J1190 (S1107) was listed in the MISO interconnection queue at the end of 2025 as a 200 MW battery project in Clinton County, IA, according to Berkeley Lab’s queue data file. The filing names Calamus East as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of June 1, 2026.

Queue IDS1107
Project nameSurplus; J1190
Status (as published)Active
SubstationCalamus East
Point of interconnectionCalamus East
CountyClinton
StateIA
VoltageNot reported
Capacity200 MW
Resource (as published)Battery
Resource categoryBattery (normalized for filtering)
Proposed online date2026-06-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Calamus East substation: 2 requests in the MISO queue, 2 active totaling 450 MW.

Queue IDProjectMWResourceStatus
J2272Not reported250HybridActive

Clinton, IA: 12 requests in the MISO queue, 7 active totaling 1,260 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC MIDWEST
Project typeGeneration
Queue date2025-07-08

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.