MISO request J1084

MISO queue ID J1084

Queue request J1084 was listed in the MISO interconnection queue at the end of 2025 as a 150 MW solar project in Clinton County, IA, according to Berkeley Lab’s queue data file. The filing names Rock Creek Substation as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2023.

Queue IDJ1084
Project nameNot reported
Status (as published)Active
SubstationRock Creek Substation
Point of interconnectionRock Creek 345 kV Substation
CountyClinton
StateIA
Voltage345 kV
Capacity150 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2023-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Clinton, IA: 12 requests in the MISO queue, 7 active totaling 1,260 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityITC MIDWEST
ClusterDPP-2018-APR West
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Construction
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: Under Construction
Queue date2018-03-12
Interconnection agreement date2021-06-15

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.