4 active projects totaling 237.4 MW in the MISO queue, plus 1 with terminal status (shown grayed).
4active projects
237.4active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| J191 | Not reported | 345 | 101.2 | Wind | Operational |
| R65 | Not reported | n/r | 92 | Wind | Operational |
| J532 | Not reported | 69 | 50 | Solar | Withdrawn |
| J4150 | Not reported | 161 | 42.2 | Solar | Active |
| G348 | Not reported | 34.5 | 2 | Other | Operational |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.