MISO request J191

MISO queue ID J191

Queue request J191 was listed in the MISO interconnection queue at the end of 2025 as a 101.2 MW wind project in Cass County, IA, according to Berkeley Lab’s queue data file. The filing names Rolling Hills Substation as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of September 1, 2012.

Queue IDJ191
Project nameNot reported
Status (as published)Operational
SubstationRolling Hills Substation
Point of interconnectionRolling Hills 345 kV Substation
CountyCass
StateIA
Voltage345 kV
Capacity101.2 MW
Resource (as published)Wind
Resource categoryWind (normalized for filtering)
Proposed online date2012-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cass, IA: 5 requests in the MISO queue, 4 active totaling 237.4 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterDPP-2012-AUG WEST
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2010-12-28
Interconnection agreement date2015-05-04
Operational date2012-09-01

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.