MISO request G348

MISO queue ID G348

Queue request G348 was listed in the MISO interconnection queue at the end of 2025 as a 2 MW project in Cass County, IA, according to Berkeley Lab’s queue data file. The filing names ITC Midwest Anita as its point of interconnection. Its status as of December 31, 2025 was “Operational”.

Queue IDG348
Project nameNot reported
Status (as published)Operational
SubstationITC Midwest Anita
Point of interconnectionITC Midwest Anita 34.5 kV
CountyCass
StateIA
Voltage34.5 kV
Capacity2 MW
Resource (as published)Diesel
Resource categoryOther (normalized for filtering)
Proposed online dateNot reported
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Cass, IA: 5 requests in the MISO queue, 4 active totaling 237.4 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

ClusterG348 G348
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Network Upgrade
Queue date2003-05-23
Interconnection agreement date2003-09-12

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.