Substation Scout

Calhoun, MI interconnection queue

14 active projects totaling 2,676 MW in the MISO queue, plus 4 with terminal status (shown grayed).

14active projects
2,676active MW
18total filed
Queue IDProjectkVMWResourceStatus
J1459 Not reported 345 670 Gas Withdrawn
J936 Not reported 345 535 Gas Withdrawn
J937 Not reported 345 535 Gas Withdrawn
J1586 Not reported 345 499 Hybrid Active
J2098 Not reported 345 309 Solar Active
J3050 Not reported 345 255 Solar Active
J2921 Not reported n/r 250 Solar Active
J204 Not reported 138 200 Wind Withdrawn
J4019 Not reported 345 200 Battery Active
J758 Not reported 138 200 Solar Operational
J806 Not reported 138 149 Solar Operational
S1058 Surplus; J806 138 149 Hybrid Active
J2815 Not reported 138 140 Solar Active
J857 Not reported 138 125 Solar Active
J1248 Not reported 138 100 Solar Active
J1430 Not reported 138 100 Solar Active
J1845 Not reported n/r 100 Battery Active
S1063 Surplus; J758 138 100 Hybrid Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first