MISO request J3050

MISO queue ID J3050

Queue request J3050 was listed in the MISO interconnection queue at the end of 2025 as a 255 MW solar project in Calhoun County, MI, according to Berkeley Lab’s queue data file. The filing names MAJESTIC - ONEIDA as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 1, 2027.

Queue IDJ3050
Project nameNot reported
Status (as published)Active
SubstationMAJESTIC - ONEIDA
Point of interconnectionMAJESTIC - ONEIDA 345.0kV
CountyCalhoun
StateMI
Voltage345 kV
Capacity255 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2027-04-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

MAJESTIC - ONEIDA substation: 2 requests in the MISO queue, 2 active totaling 655 MW.

Queue IDProjectMWResourceStatus
J3992Not reported400BatteryActive

Calhoun, MI: 18 requests in the MISO queue, 14 active totaling 2,676 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2022 East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2025-07-29

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.