Substation Scout

MISO request J758

MISO queue ID J758

Queue request J758 was listed in the MISO interconnection queue at the end of 2025 as a 200 MW solar project in Calhoun County, MI, according to Berkeley Lab’s queue data file. The filing names Verona-Foundry as its point of interconnection. Its status as of December 31, 2025 was “Operational”, with a proposed online date of April 8, 2022.

Queue IDJ758
Project nameNot reported
Status (as published)Operational
SubstationVerona-Foundry
Point of interconnectionVerona-Foundry 138kV
CountyCalhoun
StateMI
Voltage138 kV
Capacity200 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2022-04-08
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Calhoun, MI: 18 requests in the MISO queue, 14 active totaling 2,676 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
ClusterDPP-2017-FEB East (ITC)
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA; Post GIA Status: In Service
Queue date2016-11-14
Interconnection agreement date2019-10-25
Operational date2022-04-08

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first