Surplus; J758

MISO queue ID S1063

Surplus; J758 (S1063) was listed in the MISO interconnection queue at the end of 2025 as a 100 MW hybrid project in Calhoun County, MI, according to Berkeley Lab’s queue data file. The filing names Verona - Foundry as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 30, 2027.

Queue IDS1063
Project nameSurplus; J758
Status (as published)Active
SubstationVerona - Foundry
Point of interconnectionVerona - Foundry 138kV
CountyCalhoun
StateMI
Voltage138 kV
Capacity100 MW
Resource (as published)Other+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2027-09-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Calhoun, MI: 18 requests in the MISO queue, 14 active totaling 2,676 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityMETC
Project typeGeneration
Queue date2024-08-28
Components (hybrid)Other 100 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.