Calcasieu Parish, LA interconnection queue

6 active projects totaling 2,601.2 MW in the MISO queue, plus 17 with terminal status (shown grayed).

6active projects
2,601.2active MW
23total filed
Queue IDProjectkVMWResourceStatus
J484 Not reported n/r 1,056.2 Gas Operational
E0045 Entergy Louisiana LRZ 9 Generation Resource 230 770 Gas Active
J3796 Not reported n/r 770 Gas Withdrawn
J2176 Not reported 500 680 Solar Withdrawn
J2890 Not reported 138 440 Hybrid Withdrawn
J331 Not reported n/r 338 Gas Withdrawn
J1598 Not reported n/r 325 Solar Active
J2899 Not reported 230 250 Hybrid Active
J1541 Not reported 230 200 Solar Withdrawn
J2163 Not reported 230 200 Solar Withdrawn
J2167 Not reported 230 198 Solar Withdrawn
J2700 Not reported 138 170 Solar Withdrawn
J1584 Not reported 138 150 Solar Withdrawn
J2154 Not reported 230 150 Hybrid Withdrawn
J4079 Not reported 230 150 Battery Active
J568 Not reported n/r 101.6 Solar Withdrawn
J2222 Not reported 230 100 Battery Withdrawn
J3406 Not reported n/r 100 Solar Withdrawn
J634 Not reported 138 72 Solar Withdrawn
J2292 Not reported n/r 50 Solar Active
J518 Not reported 138 49.5 Solar Withdrawn
J417 Not reported 230 43 Other Withdrawn
J2373 Not reported 230 40 Other Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.