Queue request J2899 was listed in the MISO interconnection queue at the end of 2025 as a 250 MW hybrid project in Calcasieu Parish, LA, according to Berkeley Lab’s queue data file. The filing names GOOS FERRY - CHALKLEY CO as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of April 30, 2026.

Queue IDJ2899
Project nameNot reported
Status (as published)Active
SubstationGOOS FERRY - CHALKLEY CO
Point of interconnectionGOOS FERRY - CHALKLEY CO 230.0kV
CountyCalcasieu Parish
StateLA
Voltage230 kV
Capacity250 MW
Resource (as published)Solar+Battery
Resource categoryHybrid (normalized for filtering)
Proposed online date2026-04-30
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Calcasieu Parish, LA: 23 requests in the MISO queue, 6 active totaling 2,601.2 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY LOUISIANA
ClusterDPP-2022 South
Interconnection serviceERIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)Cluster Study
Study phase (as the queue printed it)Study Phase: DPP 2; Post GIA Status: Not Started
Queue date2022-09-14
Components (hybrid)Solar 250 MW + Battery

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first