Substation Scout

MISO request J1598

MISO queue ID J1598

Queue request J1598 was listed in the MISO interconnection queue at the end of 2025 as a 325 MW solar project in Calcasieu Parish, LA, according to Berkeley Lab’s queue data file. The filing names Goos Ferry as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of September 1, 2026.

Queue IDJ1598
Project nameNot reported
Status (as published)Active
SubstationGoos Ferry
Point of interconnectionGoos Ferry
CountyCalcasieu Parish
StateLA
VoltageNot reported
Capacity325 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Proposed online date2026-09-01
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Calcasieu Parish, LA: 23 requests in the MISO queue, 6 active totaling 2,601.2 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityENTERGY LOUISIANA
ClusterDPP-2020 South
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)IA Executed
Study phase (as the queue printed it)Study Phase: GIA In Process; Post GIA Status: Not Started
Queue date2023-12-11

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first