Entergy Louisiana LRZ 9 Generation Resource

MISO queue ID E0045

Entergy Louisiana LRZ 9 Generation Resource (E0045) was listed in the MISO interconnection queue at the end of 2025 as a 770 MW gas project in Calcasieu Parish, LA, according to Berkeley Lab’s queue data file. The filing names Nelson Substation (New) as its point of interconnection. Its status as of December 31, 2025 was “Active”, with a proposed online date of August 4, 2028.

Queue IDE0045
Project nameEntergy Louisiana LRZ 9 Generation Resource
Status (as published)Active
SubstationNelson Substation (New)
Point of interconnectionNelson 230kV Substation (New)
CountyCalcasieu Parish
StateLA
Voltage230 kV
Capacity770 MW
Resource (as published)Gas
Resource categoryGas (normalized for filtering)
Proposed online date2028-08-04
Source datasetBerkeley Lab Queued Up: 2026 Edition (Lawrence Berkeley National Laboratory and GridTracker, CC BY 4.0), requests through December 31, 2025

Same substation and county

Calcasieu Parish, LA: 23 requests in the MISO queue, 6 active totaling 2,601.2 MW.

Tracked changes

Not tracked. MISO rows come from an annual snapshot (requests through December 31, 2025), so this site does not compare them week to week.

Additional filed fields

UtilityEntergy Louisiana, LLC
DeveloperEntergy Louisiana, LLC
Interconnection serviceNRIS
Project typeGeneration
Study phase (standardized by Berkeley Lab)In Progress (unknown study)
Study phase (as the queue printed it)Request Status: Active; Post GIA Status: Not started
Queue date2025-08-28

Capacity is the first resource type’s MW as the data file gives it; a hybrid’s other components are listed under Components and are not added in.

Fields shown are those in Berkeley Lab’s data file, which standardizes each provider’s queue. The provider’s own queue may carry more fields and newer values. Always confirm against it before relying on any value.