Substation Scout

Tributary Switch substation interconnection queue

3 active projects totalling 200 MW in the ERCOT queue.

3active projects
200active MW
3total filed
Queue IDProjectkVMWResourceStatus
29INR0177 Rattlesnake Gap Wind SLF 138 200 Wind SS Completed, FIS Started, No IA
29INR0178 Rattlesnake Gap Solar SLF 138 0 Solar SS Completed, FIS Started, No IA
29INR0179 Rattlesnake Gap Storage SLF 138 0 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.