Substation Scout

Tap the Bagwell (#) - Clarksville (#) line, ONCOR substation interconnection queue

2 active projects totalling 75.4 MW in the ERCOT queue.

2active projects
75.4active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0292 Donelson Solar SLF 69 75.4 Solar SS Completed, FIS Started, No IA
27INR0293 Donelson Storage SLF 69 0 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.