Red River, TX interconnection queue

4 active projects totalling 330.2 MW in the ERCOT queue.

4active projects
330.2active MW
4total filed
Queue IDProjectkVMWResourceStatus
28INR0124 Silverbell Storage 138 129.2 Battery SS Completed, FIS Started, No IA
28INR0125 Silverbell Solar 138 125.6 Solar SS Completed, FIS Started, No IA
27INR0292 Donelson Solar SLF 69 75.4 Solar SS Completed, FIS Started, No IA
27INR0293 Donelson Storage SLF 69 0 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.