Tap Sulphur Springs Switch – Cash Switch substation interconnection queue

2 active projects totalling 311.1 MW in the ERCOT queue.

2active projects
311.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
23INR0495 Cartwheel BESS 2 345 156.9 Battery SS Completed, FIS Started, No IA
23INR0494 Cartwheel BESS 1 345 154.2 Battery SS Completed, FIS Completed, IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.