Tap Mustang_8 to Dillion_P8 substation interconnection queue

2 active projects totalling 401.6 MW in the ERCOT queue.

2active projects
401.6active MW
2total filed
Queue IDProjectkVMWResourceStatus
29INR0255 Los Toros Energy Center Solar SLF 138 401.6 Solar SS Completed, FIS Started, No IA
29INR0271 Los Toros Energy Center Storage SLF 138 0 Battery SS Completed, FIS Started, No IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.