Substation Scout

tap Longdraw - Farmland substation interconnection queue

3 active projects totalling 360 MW in the ERCOT queue.

3active projects
360active MW
3total filed
Queue IDProjectkVMWResourceStatus
21INR0022 Red Holly Solar 345 260 Solar SS Completed, FIS Started, IA
21INR0029 Red Holly Storage 1 345 50 Battery SS Completed, FIS Started, IA
21INR0033 Red Holly Storage 345 50 Battery SS Completed, FIS Started, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.