Tap LULING - Lockhart substation interconnection queue

2 active projects totalling 203 MW in the ERCOT queue.

2active projects
203active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0523 Demeter Storage 2 138 138 Battery SS Completed, FIS Started, No IA
25INR0130 Demeter Storage 138 65 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.