Substation Scout

Tap Liston - Bates substation interconnection queue

2 active projects totalling 177.3 MW in the ERCOT queue.

2active projects
177.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0445 Sword Solar 138 137.2 Solar SS Completed, FIS Started, No IA
26INR0446 Sword BESS 138 40.1 Battery SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.