Tap Hondo - Pearson substation interconnection queue

2 active projects totalling 161.1 MW in the ERCOT queue.

2active projects
161.1active MW
2total filed
Queue IDProjectkVMWResourceStatus
27INR0437 Hondo Arroyo Storage 138 100.7 Battery SS Completed, FIS Started, No IA
27INR0301 Hondo Arroyo Solar 138 60.4 Solar SS Completed, FIS Started, No IA

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.