7 active projects totalling 955.9 MW in the ERCOT queue, plus 1 with terminal status (shown greyed).

7active projects
955.9active MW
8total filed
Queue IDProjectkVMWResourceStatus
28INR0392 Devine Mary BESS 138 200.6 Battery SS Completed, FIS Started, No IA
27INR0206 Chacon Creek 138 189 Battery SS Completed, FIS Started, No IA
29INR0152 Ranger BESS 138 155.2 Battery SS Completed, FIS Started, No IA
27INR0203 Dunlay Solar 138 150.5 Solar SS Completed, FIS Started, No IA
27INR0437 Hondo Arroyo Storage 138 100.7 Battery SS Completed, FIS Started, No IA
25INR0610 Adam Bryant BESS 138 99.5 Battery SS Completed, FIS Started, No IA
27INR0301 Hondo Arroyo Solar 138 60.4 Solar SS Completed, FIS Started, No IA
20INR0025 Spinel Solar n/r 30 Solar Inactive

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.