Substation Scout

Tap Gunsolas Creek Sub () – Breckenridge Tap () substation interconnection queue

2 active projects totalling 153 MW in the ERCOT queue.

2active projects
153active MW
2total filed
Queue IDProjectkVMWResourceStatus
26INR0600 Crocus Solar 138 102 Solar SS Completed, FIS Completed, IA
26INR0601 Crocus Storage 138 51 Battery SS Completed, FIS Completed, IA

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.