Tap Gunsolas Creek Sub () – Breckenridge Tap () substation interconnection queue
2 active projects
totalling 153 MW in the ERCOT queue.
2 active projects
153 active MW
2 total filed
Queue ID Project kV MW Resource Status
26INR0600
Crocus Solar
138
102
Solar
SS Completed, FIS Completed, IA
26INR0601
Crocus Storage
138
51
Battery
SS Completed, FIS Completed, IA
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with ERCOT before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.