Tap EDITHCLA7B [] -- TESLA7A [] ckt2 substation interconnection queue
2 active projects totalling 503 MW in the ERCOT queue.
2active projects
503active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 26INR0173 | Juniper Ridge BESS 1 | 345 | 251.5 | Battery | SS Completed, FIS Started, No IA |
| 26INR0174 | Juniper Ridge BESS 2 | n/r | 251.5 | Battery | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.