Tap Circuit 18 (#) Mission - (#967) Gibbons Creek substation interconnection queue
2 active projects totalling 995.6 MW in the ERCOT queue.
2active projects
995.6active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 29INR0333 | Tyler Rose Power Plant 1 | 345 | 597.4 | Gas | SS Started, FIS Started, No IA |
| 29INR0336 | Tyler Rose Power Plant 2 | 345 | 398.2 | Gas | SS Started, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.