Tap BUS # Tonkawa - BUS # Dusty Road substation interconnection queue
2 active projects totaling 724.7 MW in the ERCOT queue.
2 ERCOT queue filings name Tap BUS # Tonkawa - BUS # Dusty Road as the point of interconnection, all in Fisher County, TX.
Target commercial operation date as filed: Dec 2028 (2 filings). 2 active filings target a date after November 27, 2026.
Interconnecting entity as filed: Alkali Creek Wind, LLC (2 filings).
2active projects
724.7active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| 28INR0415 | Alkali Creek Wind | 345 | 474.4 | Wind | SS Completed, FIS Started, No IA | Dec 2028 |
| 28INR0478 | Alkali Creek Wind 2 | 345 | 250.3 | Wind | SS Completed, FIS Started, No IA | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with ERCOT before relying on these figures.