Tap <345><><POSSUMTROT_5 >-<> <LAKE_HALL_5> substation interconnection queue
2 active projects totalling 601.2 MW in the ERCOT queue.
2active projects
601.2active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| 29INR0229 | Brazos Energy Center 1 | n/r | 300.6 | Battery | SS Completed, FIS Started, No IA |
| 29INR0230 | Brazos Energy Center 2 | n/r | 300.6 | Battery | SS Completed, FIS Started, No IA |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with ERCOT before relying on these figures.